Product Detail :
|
Providing, lowering into trenches with true to alignment, laying & jointing of full lengths of HDPE pipes of specified grade as per IS;4984-1995 and specifications, with testing of pipe line including supply of jointing material, Excavation in ordinary soul (loam, clay, sand) for pipe line trenches including lift up 1.5mtr and tead up to 30mtr with back filling, watering, ramming of excavated earth in the trenches for pipe line work. Hindi image
|