|
Product Detail :
|
Setting of BESS System Setting up of 90MW/225MWH battery energy storage system (BESS) near Chilla S/s Chilla HEP Distt- Pauri Garhwal to be connected on 132KV Grid connecting S/s Chilla, Distt. Pauri Garhwal, Uttarakhand
|
| Tender Detail : |
Setting of BESS System #*. Setting up of 90MW/225MWH battery energy storage system (BESS) near Chilla S/s Chilla HEP Distt- Pauri Garhwal to be connected on 132KV Grid connecting S/s Chilla, Distt. Pauri Garhwal, Uttarakhand |